×

digging pile造句

"digging pile"是什么意思   

例句与造句

  1. Constructive technology of artificial hole - digging pile
    浅谈人工挖孔桩施工技术
  2. Application of dug pile in pile foundation construction
    挖孔桩在桥梁桩基施工中的应用
  3. Construction technology of manual hole digging pile
    人工挖孔桩施工技术探讨
  4. Technical construction safety management of manual hole digging pile
    浅谈人工挖孔桩施工安全技术管理
  5. Application of complex grouting method in man - dig pile construction
    注浆在人工挖孔桩事故处理中的应用
  6. It's difficult to find digging pile in a sentence. 用digging pile造句挺难的
  7. Constructive practice of artificial hole - digging pile stabilization plan
    人工挖孔桩加固方案的施工实践
  8. Application of hole - digging pile in pile foundation construction of bridge
    挖孔桩在桥梁桩基施工中的应用
  9. Construction method of manual hole digging pile in water bearing layer
    浅析人工挖孔桩在含水层中的施工方法
  10. Safety construction of manual hole digging pile in one large - scale workshop
    浅谈大型车间人工挖孔桩的安全施工
  11. Construction of manual hole digging pile in sea - filling area with hydraulic fill sand
    吹砂填海地质人工挖孔桩施工
  12. Digging pile blast hole wall rock soil dynamic parameters detection and assessment
    挖孔桩孔壁岩土动力参数探测和评价
  13. Post grouting for hand dug piles with the pipe driven at the pile end
    静压注浆与旋喷桩在岩溶矿床地表塌陷治理中的应用
  14. Application of the high pressure circular jet grouting in the big dimension man - dig pile
    高压旋喷注浆技术在大孔径挖孔桩施工中的应用
  15. The superstructure of the bridge is a three - span ( 80m + 130m + 80m ) continuous rigid frame . the main piers are single - column flexible solid piers , whose foundation are 2 . 0m dug piles . the abutments are light - type box abutments , whose foundation are 1 . 2m bored cast - in - place piles
    该桥上部为80m + 130m + 80m三跨连续刚构;主墩为单柱柔性实体墩,其基础为2 . 0m挖孔桩;桥台为轻型箱式桥台,其基础为1 . 2m钻孔桩。
  16. The thesis introduces the biot ' s three - dimension consolidation theory based on absolute linear - elastic theory ; the thesis designs the pit dewatering scheme of hand - dug piles support of shenyang subway ' s shenyang station construction ; the thesis uses finite element program to simulate the influence on around environments caused by pit dewatering , and finds the change laws of earth mass inner stress and the effect parameters on the surface deformation on the basis of reasonable hypothesis and the analysis of ground water exploitation progress . combined with stochastic medium theory , the thesis introduces dewatering subsidence coefficient , sets up the predicting model of the surface deformation caused by dewatering , and develops the computing program ; by application of program on a single well of underwater exploitation , it is proved that the program is feasible , so the prediction of the surface deformation caused by underwater exploitation is realized
    本文介绍了基于线弹性本构关系的biot理论;设计了拟建沈阳地铁沈阳站点人工挖孔桩支护施工的基坑降水方案;利用有限元程序,模拟了基坑降水对周围环境的影响;在合理假设的基础上,分析了地下水开采过程中,地层应力的变化规律,找到了影响地面变形的参数;与随机介质理论相结合,通过引入采水下沉系数建立了地下水开采引起地面变形的预计计算模型,并编制了电算化程序;通过某单井开采实例验证了该方法的可行性,实现了地下水开采引起地面变形的预计。

相邻词汇

  1. "digging method"造句
  2. "digging my own grave"造句
  3. "digging of ditches"造句
  4. "digging out"造句
  5. "digging over"造句
  6. "digging pit"造句
  7. "digging position"造句
  8. "digging process"造句
  9. "digging roots"造句
  10. "digging shovel"造句
桌面版繁體版English日本語

Copyright © 2025 WordTech Co.

Last modified time:Sun, 17 Aug 2025 00:29:56 GMT